ADU Company in Romoland, CA
Kitchen remodeling in Romoland usually means working inside a ranch-style home built between the 1960s and 1990s, on a half-acre or larger lot with well water, propane, and a septic system. Most kitchens we see here were never designed for how families use them today: closed-off layouts, worn laminate counters, and cabinets that have been through decades of Perris Valley heat. Sunstone ADU Builders has served Romoland since 2011, and we handle the full kitchen remodel in-house, from knocking down a wall to installing the sink and range. Call (855) 949-1913 to talk through your project and get a free estimate.
Why Romoland Homes Are Different
Romoland sits in unincorporated Riverside County, so permits run through the County of Riverside rather than a city planning counter. That shapes how a kitchen remodel moves through review, inspection, and final sign-off, and it changes timelines compared to jobs in nearby Menifee or Perris. For a kitchen remodel specifically, the big variables we work around are older framing, slab-on-grade foundations, and electrical panels that were sized for a 1970s appliance load, not a modern kitchen with double ovens, a microwave drawer, and countertop appliance circuits.
The climate matters too. Summer temperatures in the Perris Valley routinely push past 100 degrees, and Santa Ana winds blow through in the fall. A kitchen remodel here is the right moment to upgrade ventilation, add a proper range hood that actually exhausts outside, and choose surface materials that hold up to heat and low interior humidity. We also see homes with existing evaporative coolers, and kitchens that need better window placement or shading to stay usable during late-afternoon heat. These aren’t cosmetic decisions; they change how the room feels every single day.
Lot size is another Romoland distinction. Homes here sit on multi-acre or half-acre parcels, which gives us room to stage materials, place a dumpster, and keep the work contained without fighting for street parking. But it also means dust control matters, especially when the Santa Anas kick up. We protect adjacent living spaces and seal off the work zone because the same wind that cools the yard in the evening will carry drywall dust through an open window in minutes.
Our Main Romoland Services
Most Romoland homeowners call us about two things: building a backyard ADU and remodeling a bathroom, often as part of the same long-term plan for the property. Here’s how each one works on 92585 lots.
ADU Builders in Romoland
Romoland’s housing stock is a mix of older ranch homes and manufactured homes on large rural-residential parcels, and most of those parcels have room for a detached ADU without the setback battles that stall projects on small suburban lots. The real question is usually the septic system, not the lot lines. We specialize in ADU construction only, and we’re authorized to build and install units from Abodu, Plant Prefab, and other leading prefab brands alongside traditional stick-built structures. ADU Builders in Romoland is our dedicated page for how the process works here, from County of Riverside permits to well and septic capacity checks.

Bathroom Remodeling in Romoland
Bathrooms in Romoland’s older homes are tight, often 5 feet by 8 feet, with original cast-iron tubs and single-sink vanities. When homeowners add an ADU for rental income or family, they typically want the main home’s bathroom updated to match, or they need the ADU’s bathroom finished to a rentable standard. We handle both, and because we’re an ADU specialist with in-house bathroom remodeling, we can do it under one contract. Bathroom Remodeling in Romoland explains the typical scope, fixtures, and county inspection requirements.

What happens when you call
- 1
A real person answersNo phone trees — you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Kitchen Remodeling in Romoland

A kitchen remodel in Romoland usually means opening up a closed-off ranch-era floor plan, replacing builder-grade cabinets and laminate counters, and upgrading electrical and ventilation to handle modern cooking. Because most 92585 homes are on septic, we also plan carefully around drain locations and avoid moving the sink more than a few feet unless the homeowner wants to open up the slab, which most don’t. Sunstone ADU Builders handles the entire kitchen remodel in-house, including cabinet installation, countertops, flooring, plumbing, and electrical, so you’re not coordinating a tile contractor and an electrician on your own. For a broader look at how we approach kitchen work anywhere in our service area, start with our Kitchen Remodeling page.
Cabinet Replacement and Layout Changes
Signs you need it
Cabinet doors that no longer close square, drawer slides that bind, and a layout that forces everyone into the same corner are the usual signals in Romoland’s older ranch kitchens.
What it costs in Romoland
Full kitchen cabinet replacement and layout reconfiguration in Romoland typically runs $18,000 to $45,000, with stock cabinet packages at the lower end and custom or semi-custom cabinetry with layout changes at the upper end.
How we do it
We measure the existing footprint, confirm load-bearing walls with the county-approved plans, remove old cabinets, set new ones on a level line, and shim and adjust every door and drawer before countertop template and install.
Countertop and Backsplash Upgrade
Signs you need it
Chipped laminate edges, stains that won’t lift, and grout lines behind the range that have absorbed years of cooking oil are the main reasons Romoland homeowners replace countertops and backsplashes.
What it costs in Romoland
Countertop and backsplash replacement in Romoland usually runs $4,000 to $12,000, with laminate or butcher block at the low end, granite and quartz in the middle, and large-format porcelain or full-height stone backsplashes at the high end.
How we do it
We template the new countertop after the cabinets are set, fabricate the stone off-site, install the slab and sink, then run the backsplash from counter to upper cabinets with a leveled layout.
What Kitchen Remodeling Costs in Romoland
| Item | Typical range in Romoland |
|---|---|
| Cabinet replacement and layout changes | $18,000 – $45,000 |
| Countertop and backsplash replacement | $4,000 – $12,000 |
| Full kitchen remodel (combined scope) | $45,000 – $110,000 |
Labor availability, the price of stone and sheet goods, and the distance from major supply yards in Menifee and Perris all influence the final number. We give you a written line-item quote before work starts, and we hold to it unless you change the scope.
Do I need a permit to remodel a kitchen in Romoland?
Most kitchen remodels in Romoland that move plumbing, electrical, or walls require a building permit through Riverside County. Cabinet-only replacements typically do not. We pull the permits and handle the inspections as part of our scope.
How long does a kitchen remodel take in Romoland?
Most kitchen remodels in Romoland take 4 to 8 weeks from demo to final inspection. Custom cabinetry, structural work, or septic-related drain changes add time. Call (855) 949-1913 and we’ll give you a schedule that fits your project.
Brands We Service in Romoland
We build with a small set of proven brands, including Abodu and Plant Prefab for prefab ADUs, Tuff Shed for accessory structures, and James Hardie fiber cement siding for exteriors that hold up to Perris Valley heat and Santa Ana winds. Our brands page shows what we stock and which fits which project, and most materials arrive at Romoland job sites within two to three weeks.
Pricing for ADU Company in Romoland, CA
| Service | Typical range in Romoland |
|---|---|
| Detached ADU, prefab (1-bedroom) | $180,000 – $300,000 |
| Detached ADU, stick-built (1-bedroom) | $220,000 – $350,000 |
| Detached ADU, stick-built (2-bedroom) | $300,000 – $450,000 |
| Garage conversion to ADU | $120,000 – $220,000 |
| Junior ADU (JADU) | $80,000 – $160,000 |
| Bathroom remodel, 5×8 standard | $18,000 – $35,000 |
| Bathroom remodel, larger or primary bath | $30,000 – $60,000 |
| Kitchen cabinet replacement and layout changes | $18,000 – $45,000 |
| Countertop and backsplash replacement | $4,000 – $12,000 |
| Full kitchen remodel | $45,000 – $110,000 |
In Romoland, two local factors push costs: septic capacity upgrades when a new ADU adds a bathroom or kitchen, and the long material runs from suppliers in Menifee or Perris. If a septic system can’t handle another dwelling unit, the fix (a new leach field or tank upgrade) can add $15,000 to $40,000 before we even set a form. We quote that work separately and explain it up front, never as a surprise change order.
Neighborhoods We Serve in Romoland
We work all over the 92585 ZIP code, from the older ranch parcels off Highway 74 to the rural-residential spreads near the San Jacinto River channel and the newer lots on the northern edge toward Perris. Romoland is compact enough that we don’t zone our pricing by neighborhood, but we do plan deliveries and dumpster drops around each lot’s access.
- Heritage Lake area
- Menifee Road corridor
- Highway 74 frontage parcels
- Ellis Avenue rural lots
- Briggs Road area
Service Area – Cities Near Romoland
Sunstone ADU Builders serves Romoland and the surrounding Riverside County communities, including Sun City, CA to the southeast, Good Hope, CA to the north, Quail Valley, CA across the lake, and Perris, CA just west. We schedule estimates across the area every week, and we often bundle calls for rural lots that share the same permit and septic review path.
Serving Romoland, CA — Our Local Coverage Area
We’re based in the Romoland area and know this community well. Use the map below to see our service coverage — if you’re nearby, we can almost certainly help.
FAQs About ADU Company in Romoland
We work in Romoland regularly. Our crews are on 92585 job sites for ADU construction, kitchen remodels, and bathroom remodels throughout the year. Estimates are free and we schedule them in person, not over a video call.
Yes. Most Romoland parcels are on septic, and any ADU with a bathroom or kitchen triggers a septic system review by Riverside County Environmental Health. If the system can’t support another bedroom, the county will require an upgrade before we can pull the building permit.
Design and permitting usually takes 2 to 4 months for an ADU, depending on county review times and septic verification. Kitchen and bathroom remodels often start faster, sometimes within a few weeks of signing. Call (855) 949-1913 and we’ll give you a real start window, not a sales promise.
Call Sunstone ADU Builders at (855) 949-1913 to schedule your free estimate in Romoland. We’ll walk your lot, check the septic and electric realities, and give you a written plan with real numbers.
What happens when you call
- 1A real person answersNo phone trees — talk to a local adu pro.
- 2You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
- 3We come out and measureLicensed & insured, at a time that suits you — the visit and the quote are both free.
- 4You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.
What Romoland Customers Say
"He was honest that our lot had a slope problem that would add real cost, before we signed anything."
— Paul Pruitt"The kitchenette layout he suggested made better use of the space than the one on our original sketch."
— Beatriz Garcia"Detached unit in the back yard. Utilities trenched, separate meter, and it passed final on the first inspection."
— Reggie Ellison